6 C
London
Wednesday, January 26, 2022

Rajasthan

- Advertisement -

NARESH INFRA PROJECT PVT LTD got contract from NHAI for Road improvement in Rajasthan

Work of Improvement of Riding Quality Programme of pavement NH-927A (Swaroopganj Kotra-Som-Kherwara-) (Total Km 46.00) from km 8/0 to15/0,84/0 to 98/0 and...

MoRTH has been proposed the construction of bridge to RK Constructions India Private Limited in Rajasthan, Rs, 45156120.00/-

CONSTRUCTION OF 50.00M SPAN BRIDGE OVER AT KM. 95.380 ON SAWAIMADHOPUR SHEPOUR NH-552 EXT IN THE STATE OF RAJASTHAN (JOB NO. NH-552EXTN -RJ-2020-2 L-RSCE-32)

New Road Project in Rajasthan Value 74 Cr. by Ministry of Road Transport & highway.

[NH-8 (Beawer-Gomti Section) On EPC Mode in the State of Rajasthan (Package-3)][NIT 04/2020-21 PALI]

M/s Ramesh kumar Bansal got the project in Rajasthan for upgradation the 4-lane road.

Up Gradation to 4-Lane with Paved Shoulder from Existing KM 108.60 to KM 144.00 and Km 158.42 to KM 173.30 of NH-8 (Beawer-Gomti Section) On EPC Mode in the State of Rajasthan (Package-2

R K JAIN INFRA PROJECTS PVT. LTD. को मिला MoRTH से प्रोजेक्ट Rs. 227.17Cr

Up Gradation to 4-Lane with Paved Shoulder from Existing KM 58.245 to...

Govindam BRJ Infra Projects Pvt. Ltd got the project by MoRTH in Rajasthan

Strengthening or Widening or New Construction in Km 3.400 to 50.0 (excluding chainage 5.975 to 19.525 and 26.825 to 41.200) on NH-11

Bharti Construction Company को MoRTH से राजस्थान में मिला 2 lane रोड का प्रोजेक्ट

[Two lane with paved shoulder from existing chainage Km. 216.440 to 227.470, 243.630 to 251.120 and Strengthening from Km. 214.600 to 216.440, 227.470 to 243.630 Section of NH-927A in the State of Rajasthan on EPC mode ][NIT 06/2020-21 CE PWD NH Jaipur]
- Advertisement -

Must Read

NHAI New Consturction of 4 Lane Elevated corridor in Lucknow-Sitapur

Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24...
- Advertisement -

M/s JKM INFRA WORKS LLP Got Widening/Improvement to 4 (Four) Lane with Paved Shoulder in the state of Assam

Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7)...

Construction of new 2 Lane Major Bridge in the State of Bihar

Construction of new 2 Lane Major Bridge with its approaches from design Chainage 0.000 to 2.150 across River Sone in the State...

M/s PUNA HINDA Gets Construction of Balance Work of 2 Lane with Paved Shoulders in the State of Arunachal Pradesh

Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00...

Welcome To Subinfra

Get information of Exclusive Projects
Hurry Now!!!