The Public Works Department (PWD) – CE AND AS, in collaboration with ACE Bharatpur, SE Bharatpur, and EE Kumher, has invited a tender for a crucial road infrastructure project in the Bharatpur district. The project involves widening and strengthening of the existing road from Bas Burja to Deeg (Panhori) via Govindgarh, Padalwas, Kakda, and Panhori.
This road stretch is a vital link for commuters and transporters in the region, connecting several villages and local economic centers. Its upgrade is expected to enhance mobility, safety, and travel efficiency, particularly for rural and semi-urban commuters.
The financial bid opening took place on 19th June 2025, with participation from several construction firms. The tender was floated by the concerned regional PWD offices, demonstrating the state’s continued investment in regional connectivity and infrastructure growth.
Following bid evaluation, Kamal Builders emerged as the lowest bidder for this project. Their proposal was found to be technically sound and financially competitive, with a quoted amount of ₹39,99,42,755.5.
This project is part of Rajasthan’s broader push to strengthen its rural road network and ensure better access to essential services, markets, and nearby towns.
Key Points:
- Project Scope: Widening and strengthening of Bas Burja–Deeg (Panhori) road.
- Route: Via Govindgarh, Padalwas, Kakda, and Panhori.
- Tender Issued By: PWD – CE AND AS || ACE Bharatpur || SE Bharatpur || EE Kumher.
- Bid Opening Date: 19th June 2025.
- Contractor Name: Kamal Builders.
- Project Cost: ₹39,99,42,755.5
- H N Choudhary Construction Private Limited Got A Project: IRQP/Strengthening Work of Raghunathpur to Barmasia Road
- Dilip Kumar Got A Project: Re-construction work (including bridge construction) of Kumharia more
- Manoj Kumar Singh Got A Project: Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road
- Chitra Construction Got A project: IRQP Work for Harinchara more (SH-18) to Barhait (MDR-211) from KM 0.00 to 23.60 and Kherwa Shivgadi Link Road
- Aquatic Pump Industries Got A Project: for Construction of High Level Pedestrian Suspension Bridge Across Narmada River



