The Directorate General Border Roads Organisation (BRO), through HQ CE (P) Sampark, Jammu, has invited a tender for the upgradation of key bridges under its jurisdiction. This initiative is part of BRO’s ongoing efforts to strengthen vital road infrastructure in Jammu and Kashmir, ensuring safe and uninterrupted connectivity in strategically important areas.
The project covers the replacement and upgradation of three existing bridges. At Km 27.595, the existing Peru Bridge will be upgraded with a 65 m span Permanent Modular (PMT) bridge. Similarly, at Km 48.846, the existing 60.45 m span RCC T-Beam Dhunari Bridge will be reconstructed as a 65 m span PMT bridge, ensuring higher load capacity and longer service life.
In addition, the project includes the upgradation of the 365 m span RCC T-Beam Ujh Bridge located at Km 54.380. The replacement with a more durable and permanent structure will address rising traffic demands and improve overall connectivity in the region. These works collectively aim to enhance road safety, streamline transportation, and support both civilian and defense logistics.
The financial bid opened on 26th August 2025, with V.K. Gupta & Associates quoting the minimum value. The total project cost is estimated at ₹29,97,00,000, reflecting the scale and importance of these bridge works.
Key Points:
- Issued by BRO, HQ CE (P) Sampark, Jammu
- Upgradation of Peru Bridge (65 m PMT) at Km 27.595
- Reconstruction of Dhunari Bridge (65 m PMT) at Km 48.846
- Upgradation of Ujh Bridge (365 m span) at Km 54.380
- Focus on durable PMT structures for safety & load capacity
- Project value: ₹29,97,00,000
- Contractor Name: V.K. Gupta & Associates
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali





