The Public Works Region – Nagpur, through the Public Works Circle – Chandrapur and the Public Works Division No. 1, Chandrapur, has invited a tender for the new construction of the Madheli–Warora Road section of State Highway (SH)–371. The work covers the stretch from CH 0-00 (Design Km 23-400) to CH 2-000 (Design Km 25-400), located in Tahsildar Warora, District Chandrapur.
This project is aimed at creating a high-quality roadway to improve connectivity within the district, reduce travel time, and support economic activities in the region. The new construction will be built to modern standards, ensuring durability, better traffic capacity, and enhanced safety for commuters.
The tender process, managed by the Public Works Region – Nagpur, saw the financial bid opening on 16th July 2025. The project drew interest from well-qualified contractors capable of executing state highway works with precision and efficiency.
Following the evaluation process, Shri Jai Girnari SRK JV emerged as the lowest bidder. Their selection reflects confidence in their technical expertise and track record of delivering quality infrastructure projects on time.
The total estimated value of the project stands at ₹24,32,73,855.6, representing a significant investment in Chandrapur’s road infrastructure and regional connectivity.
Key Points:
- Project: New construction of Madheli–Warora Road (SH–371)
- Road Length: CH 0-00 to CH 2-000 (Design Km 23-400 to 25-400)
- Location: Tahsil Warora, District Chandrapur
- Financial Bid Opening: 16th July 2025
- Contractor Name: Shri Jai Girnari SRK JV
- Project Value: ₹24,32,73,855.6
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali




