The Haryana Government, through the Engineer-in-Chief, PW (B & R) Department, SE Karnal, and EE PD-1 Karnal, has invited a tender for the Strengthening of the Karnal–Ramba–Indri–Ladwa Road (Road ID 7169, SH-07) in Indri Constituency, Karnal District. The project covers Km 0.00 to Km 20.500 under the Work Programme for 2025–26, aiming to improve road durability, traffic safety, and riding comfort along this vital regional corridor.
The proposed strengthening work includes laying 60mm Dense Bituminous Macadam (DBM), 40mm Bituminous Concrete (BC), and 80mm interlocking paver blocks in designated sections. These upgrades are intended to provide a stronger road surface, reduce maintenance costs, and enhance long-term performance under increasing traffic pressure. The works also involve surface preparation, compaction, edge protection, and related finishing activities in compliance with PWD standards.
The improved stretch will benefit local residents, agricultural transporters, and daily commuters by ensuring smoother connectivity between Karnal, Indri, and Ladwa. The project will also play a key role in strengthening regional infrastructure, boosting economic mobility, and supporting the Haryana Government’s ongoing rural-urban connectivity initiatives.
The financial bid was opened on 14th October 2025, with Mahender Singh Contractor quoting the lowest bid value. The total project cost is Rs. 27,94,14,303.4, marking a major step toward enhancing the district’s road infrastructure.
Key Points
- Tender by Haryana PW (B & R) Department, SE Karnal, EE PD-1 Karnal.
- Strengthening of Karnal–Ramba–Indri–Ladwa Road (SH-07).
- Covers Km 0.00 to Km 20.500 in Indri Constituency.
- Includes 60mm DBM, 40mm BC, and 80mm paver blocks.
- Financial bid opened on 14 Oct 2025.
- Contractor Name: Mahender Singh Contractor
- Project value Rs. 27,94,14,303.4.
- M/s Tirupati Enterprises Got A Project: Widening and Strengthening of Road NH-52 (Deva Khera) to NH-148D
- M/s Ram Khiladi Meena Got A Project: Strengthening of Road from Dausa Sariska (SH 29A) KM 8/0 TO 38/0
- M/s RSC Infratech Developers LLP. Got A Project: Strengthening and Widening work for Kerot Jetpura Chawandiya Padliya
- Ram Swaroop Jat Got A Project: Strengthening and Widening work for SH 12 (Dhuwaliya)
- M/S OM Construction Company Got A project: Widening and Strengthening of Didwana-Marwar Baliya – Khunkhuna- Runwa- Badabara – Khatu Khurd




