The Ministry of Road Transport and Highways (MoRTH), through its P6 Delhi office in coordination with RO Mumbai and NH Division–Akola, has invited a tender for a Performance-Based Maintenance Contract (PBMC). The project focuses on the maintenance of the Khamgaon to Deulgaon Sakarsha section of National Highway-548C in Maharashtra. The total project length is 28.90 km, covering km 0.000 to km 28.300 and km 32.100 to km 32.700.
This section of NH-548C features a two-lane road with paved shoulders and is an important route for local and regional traffic. Under the PBMC framework, the selected contractor will be responsible for maintaining road performance standards over a specified period. This includes surface repairs, upkeep of road shoulders, drainage systems, and ensuring overall safety and usability.
The objective of the PBMC model is to ensure cost-effective, long-term road maintenance by holding the contractor accountable for performance outcomes rather than individual tasks. This approach aims to enhance efficiency, extend road life, and provide better value for public investment.
The financial bid for this contract was opened on April 30, 2025. M/s. Tulsi Narayan Garg submitted the lowest quote and was declared the L1 bidder. The estimated value of the project is ₹17,37,10,415.
Key Points:
- Tendering Authority: MoRTH – P6 Delhi, RO Mumbai, NH Division–Akola.
- Project Type: Performance-Based Maintenance Contract (PBMC).
- Location: Khamgaon to Deulgaon Sakarsha, NH-548C, Maharashtra.
- Road Type: Two-lane with paved shoulders.
- Financial Bid Opening: April 30, 2025.
- Contractor Name: M/s. Tulsi Narayan Garg
- Project Value: ₹17,37,10,415.
- Raisingh and Company Got A Project: Construction of Railway Over Bridge at Railway Crossing no. 269 at KM 937/28-30 Amla-Nagpur Section on Amravati road
- Nityanta Infra projects Private Limited Got A project: Construction of High Level Bridge Across Runj River in KM 2 on Guchhara to Kalyanpur Road
- H N Choudhary Construction Private Limited Got A Project: IRQP/Strengthening Work of Raghunathpur to Barmasia Road
- Dilip Kumar Got A Project: Re-construction work (including bridge construction) of Kumharia more
- Manoj Kumar Singh Got A Project: Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road

