The Ministry of Road Transport and Highways (MoRTH), through P7 Delhi, Regional Office Vijayawada, and NH Division Vijayawada, has invited a tender for a major road infrastructure development project. The initiative is part of the ministry’s ongoing efforts to strengthen and upgrade the national highway network, ensuring improved connectivity, safety, and efficiency for road users.
The project will involve significant construction and improvement works under the supervision of MoRTH’s Regional Office, Vijayawada. While the tender notice did not specify the exact stretch in the provided details, the work falls under the purview of the NH Division Vijayawada, indicating its importance for regional connectivity in Andhra Pradesh.
The financial bid for this project was opened on 3rd July 2025 by MoRTH authorities. The evaluation process adhered to competitive and transparent bidding guidelines, ensuring the selection of a technically competent and financially viable contractor.
M/s Siva Sai Constructions emerged as the lowest bidder for the project. Their proposal was found to meet the technical standards and cost considerations outlined by MoRTH for the scope of work.
The total project value, as quoted by Siva Sai Constructions, is ₹56,44,62,660.9, reflecting a substantial investment in upgrading the highway infrastructure under the Vijayawada division.
Key Points:
- Tendering Authority: Ministry of Road Transport & Highways (MoRTH)
- Location: Under RO Vijayawada, Andhra Pradesh
- Scope: Road infrastructure development under NH Division Vijayawada
- Bid Opening Date: 3rd July 2025
- Contractor Name: M/s Siva Sai Constructions
- Project Value: ₹56,44,62,660.9
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali





