The Ministry of Road Transport and Highways (MoRTH), through P1 Delhi, RO Chandigarh, and the NH Division–Rohtak, has invited a tender for the Construction of a 6-lane VUP (Vehicular Underpass) at the junction of NH-148B (4-Lane) and NH-709E (4-Lane) on the Bhiwani Bypass in Bhiwani district. This junction is a critical traffic node, and the proposed VUP aims to decongest the intersection, streamline vehicular movement, and enhance road safety along this busy national highway corridor.
The project involves constructing a structurally robust 6-lane underpass with reinforced concrete components, approach ramps, retaining structures, drainage facilities, and safety installations. The design focuses on enabling free-flow traffic across the bypass, reducing conflict points, and improving connectivity between major routes. Once implemented, the VUP will significantly cut travel delays, support heavy vehicle movement, and improve overall mobility in the Bhiwani region.
The financial bid opening is scheduled for 15th September 2025, under the supervision of MoRTH’s Delhi, Chandigarh, and Rohtak offices. During financial evaluation, Krishan Kumar Contractor emerged as the bidder with the minimum quoted value, meeting all competitive and financial norms of the ministry.
The total project value is ₹270,100,000, marking a substantial infrastructure investment aimed at modernizing highway junction design and enhancing traffic efficiency in Bhiwani district.
Key Points
- Tender invited by MoRTH (Delhi, Chandigarh & Rohtak units)
- Project: Construction of 6-lane VUP at NH-148B & NH-709E junction
- Location: Bhiwani Bypass, Bhiwani district
- Financial bid opening on 15 September 2025
- Contractor Name: Krishan Kumar Contractor
- Project value: ₹270,100,000
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali





