The Rajasthan State Road Development and Construction Corporation Limited (RSRDCC) – GM invited a tender for the renewal work of Kota–Kaithoon–Sangod–Bapawar–Kawai Road (SH-51). The scope of work covers stretches from Km 58/0 to Km 89/0 and Km 100/0 to Km 111/0, ensuring improved surface quality and durability along this vital state highway corridor.
The project primarily involves renewal and strengthening measures such as resurfacing, pothole repairs, application of bituminous layers, and upgrading road safety provisions. These interventions aim to extend the service life of the highway while providing commuters with smoother, safer, and more reliable connectivity.
Strategically, this highway plays an important role in connecting Kota and adjoining regions with Bapawar and Kawai, supporting local trade, agriculture, and daily mobility. The renewal will help reduce travel time, vehicle operating costs, and risks of road accidents.
The financial bid was opened on 22nd August 2025, with Choyal Construction Company emerging as the lowest bidder for the project. Their competitive quotation positions them favorably for the contract award.
The total project value is ₹189,376,312.6 (₹18.93 crore approx.), reflecting RSRDCC’s continued efforts toward strengthening Rajasthan’s road infrastructure.
Key Points:
- Authority: RSRDCC – GM
- Location: Kota–Kaithoon–Sangod–Bapawar–Kawai Road (SH-51)
- Stretch: Km 58/0–89/0 & Km 100/0–111/0
- Scope: Road renewal and strengthening works
- Contractor Name: Choyal Construction Company
- Project Value: ₹189,376,312.6
- M/s Sildiliya Construction Got A Project: Widening Strengthening Reconstruction of Ghanghri to Koleshwari Temple via Dantar Road from KM 0.00 to 10.935
- Ramprasad Rathore Contractor & Suppliers Got A Project: Upgradation of Kalpi Chhindgaon Pipariya Road Length 31.30 KM. Including Electrification Work.
- Ravi Shankar Jaiswal Got A Project: Upgradation of Balpur Dhanora Road Length 17.50 KM. Including Electrification Work
- M/s Dilip Singh Raghuvanshi Got A Project: Construction of Gotegaon Dhooma MDR Road Length 18.60 KM.
- Manish Agrawal Got A Project: CONSTRUCTION OF UJJAIN TIRAHA TO NAGUKHEDI ROAD LENGTH 3.70 KM WITH ELECTRIFICATION WORK DIVISION NEEMUCH





