The Highways Department – Metro Wing, under the CMDP Circle, has invited a tender for a crucial urban infrastructure project aimed at easing congestion and enhancing railway crossing safety. The project involves the construction of a Road Over Bridge (ROB) in lieu of Level Crossing (LC) No. 32, situated between Tambaram and Vandalur railway stations, near Perungalathur in Chennai. This tender pertains specifically to Balance Work – Part II, highlighting the continuation of a previously initiated urban mobility project.
The ROB project is expected to significantly reduce traffic delays and enhance commuter safety by replacing a frequently congested level crossing with a dedicated bridge. Located in a high-traffic suburban corridor, the project will benefit thousands of daily commuters and contribute to Chennai’s long-term urban transport planning goals.
The financial bid for the project was opened on 7th May 2025, attracting participation from multiple infrastructure firms. The competition reflects the project’s importance in addressing one of the region’s key transportation bottlenecks.
Upon evaluation, Babuji Civil Construction emerged as the lowest bidder, making them eligible for executing the remaining portion of this ROB project. The project value is ₹29,75,36,443, reflecting a strategic public investment to modernize and streamline suburban transport infrastructure.
Key Points:
- Department: Highways – Metro Wing, CMDP Circle
- Location: Near Perungalathur, Chennai
- Project: ROB in lieu of LC-32 (Tambaram–Vandalur stretch)
- Scope: Balance Work – Part II
- Bid Opening Date: 7th May 2025
- Contractor Name: Babuji Civil Construction
- Project Value: ₹29,75,36,443
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali





