Jaipur Development Authority (JDA), through Director – Engineering II, S.E. 03, and Ex. En. 08, has invited a tender for the Demarcation and Construction of various sector roads and missing link roads in Zone 12 area of Jaipur. The project is planned as a two-year rate contract, aiming to systematically upgrade road infrastructure within the designated zone and improve overall urban connectivity.
The scope includes surveying and demarcation of new road alignments, constructing missing link roads, and upgrading existing pathways to meet urban development standards. These works are designed to enhance mobility for residents, reduce traffic congestion, and improve access to residential, commercial, and institutional areas within Zone 12. The project is a critical component of Jaipur Development Authority’s broader urban planning and modernization initiatives.
The financial bid for this tender was opened on 15th September 2025 by JDA officials, including Director – Engineering II, S.E. 03, and Ex. En. 08. The evaluation process followed strict departmental protocols to ensure transparency and competitiveness. Multiple contractors participated, reflecting the strategic importance and scale of the project in the city’s development plans.
Among all bidders, Hardayal Constructions and Projects LLP submitted the minimum quoted value for execution. The total estimated project cost stands at Rs. 312,340,864.9, representing a significant investment in urban road infrastructure. Completion of these works is expected to improve local traffic flow, safety, and connectivity across Zone 12 of Jaipur.
Key Points
- Tender for Demarcation & Construction of sector and missing link roads.
- Project location: Zone 12, Jaipur.
- Two-year Rate Contract.
- Financial bid opened on 15 September 2025.
- Contractor Name: Hardayal Constructions and Projects LLP.
- Project value: Rs. 312,340,864.9
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali
- M/s Foujdar Constt. Co Got A Project:FOUR LANE CONSTRUCTION WORK OF BHARATPUR ACHHANERA ROAD