
Shri Rajendra Kumar Kalal Got a project:Widening and Strengthening Road in Rajasthan
The Public Works Department (PWD) – CE and AS, in collaboration with ACE Udaipur, SE Pratapgarh, and EE Dhariyawad, has
The Public Works Department (PWD) – CE and AS, in collaboration with ACE Udaipur, SE Pratapgarh, and EE Dhariyawad, has
The Public Works Department (PWD) – CE and AS, in association with ACE Jaipur II, SE Rural Jaipur, and EE
The Public Works Department (PWD) – CE and AS, in coordination with ACE Jaipur II, SE Rural Jaipur, and EE
The Jaipur Development Authority (JDA) through the Director – Engineering – I, S.E. – Ring Road Project, and Executive Engineer
Project Discription: Widening and Strenghtening of NH-48 Kanwaliyas to Dhanop Kerot (Km 0/0 to 18/700) upto MDR-154 Job No. CRIF/1059/RJ/23-24]
Project Discription: Widening and Strengthening of Tonk Rasili Mozmabad Bagru Begus Lalpura Hingonia Bagawas Luniyawas road (MDR-81) Km 2/00 to
Project Discription: Widening and Strengthening from Intermediate lane to double lane of Pirawa-Awar via Kotari, Roopakhedi, Hadmatiya Km 0/0 to
Project Discription: Widening and Strengthening of Udpura-Mordi-Isarwala- Masotiya-Talwara-Gopinath Ka Gadha-Jolana Road Km. 0/700 to 6/0, 6/800 to 12/500, 14/0 to
Project Discription: STRENGTHENING AND WINDENING OF PHALODI (NH-15) TO NEEDER VIA AHU PACHUDI NAGAUR TARANU TOSHINA KUCHAMAN, RENWAL KALADERA KM
Project Discription: Operation, Maintenance and Collection of user fee (toll fee) at designated Toll Plaza under Alternate route to Ghat
Project Discription: Widening and Strengthening of Govindgarh (NH-52) to JeenmataJi via Hasteda, Itawa, Badhal, Pachar, Khachariyawas, Bay, Ganoda, Kochor Km
Project Discription: Construction of Drain at Sikar Road from Murlipura to Dravyawati river (package 1 and 2) in phase I,
Operation and Maintenance with Periodic Renewal on 2 lane with PS of Uncha Nagla-Khanua-Roopwas-Dholpur section of NH-123 in the state
Improvement with DBM or BC and Maintenance for 2 Lanning with Paved Shoulders of Jodhpur Pokaran of NH 125 Length
Construction of Balance works (Bow String type Girders plus composite type girders plus PSC girder in Railway portion from ROB
Construction of VUP near marwar industrial Cluster on NH 62 jodhpur pali section from km 300.000 to 342.550 in the
Upgradation of NH 448 (Old NH-79) Ajmer-Nasirabad Road from 2 lane to 4 lane divided carriageway on existing chainage km.
Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli
Widening and Strengthening of Pali Rupawas Bhawri Kulthana Mokalsar Road (SH-64 A) (Km. 19/0 to 40/0)] [RSRDC NIT 037/2023-24 (SL-2)
[Construction of ROB at LC No. 167A Agrasen Nagar, Churu] [NIT No. 38/2023-24 ACE ZONE BIKANER][2024_CEPWD_382662_1] Department Name : PWD
© Copyright 2025, All Rights Reserved to New Project Information - Powered by SUBINFRA