The Public Works Department (PWD) – CE and AS, through the Additional Chief Engineer (ACE) – Ajmer, Superintending Engineer (SE) – Tonk, and Executive Engineer (EE) – Tonk, has invited a tender for the construction of an extra-dosed PSC box bridge across the Banas River. This bridge will form a crucial part of the road connection from Deoli to Jaipur via Bisalpur and Todaraisingh in Tonk district, Rajasthan.
The extra-dosed PSC box bridge design combines the benefits of cable-stayed and prestressed concrete girder bridges, providing durability, longer spans, and reduced maintenance requirements. This project will play a vital role in improving road connectivity and transportation efficiency in the region, particularly benefiting commuters and goods movement between Tonk and Jaipur.
The tender’s financial bid was officially opened on 25th July 2025 by PWD officials from the Ajmer zone. The process followed transparent bidding procedures to ensure competitive participation and selection of the most suitable contractor.
ALTIS Holding Corporation emerged as the lowest bidder in the evaluation process, indicating their potential appointment for the execution of the project. The company’s bid reflects both the technical and financial feasibility for this major infrastructure development.
The total value of the project, as quoted by ALTIS Holding Corporation, stands at ₹99,72,00,000, underlining its significance as a high-investment regional connectivity initiative.
Key Points:
- Tendering Authority: PWD – CE and AS, Ajmer Zone
- Location: Banas River, Tonk District, Rajasthan
- Scope: Extra-dosed PSC box bridge construction on Deoli–Jaipur route via Bisalpur & Todaraisingh
- Bid Opening Date: 25th July 2025
- Contractor Name: ALTIS Holding Corporation
- Project Value: ₹99,72,00,000
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali
- M/s Foujdar Constt. Co Got A Project:FOUR LANE CONSTRUCTION WORK OF BHARATPUR ACHHANERA ROAD





