Construction and Maintenance of Following Roads of Total Length: 25.900Km and A Bridge of Length 17.11m ([JH-P3-22-23-WSM-09] [PMGSY-III-NIT-60][2023_CEJHR_122949_38]) Department Name
Strengthening and widening and Reconstruction to Two lane with paved shoulder for Sisai-Basia road.(Including Bridge) Under Road Division Gumla(Total Length