The Public Works Department Madhya Pradesh under the Bhopal CE Bridge Zone PWD invited a tender for the Kunwari River Submersible Bridge Project. The project involves the construction of a submersible bridge across the Kunwari River on the Itaura–Sujarma Road in Morena district, including the development of approach roads.
The scope of work includes construction of the submersible bridge, approach road development, river protection measures, drainage arrangements, and other allied civil works. The project is designed to improve connectivity between surrounding villages, facilitate smoother transportation, and provide reliable road access across the Kunwari River.
As per the tender details, the financial bid was opened on 14 March 2026 by the PWD authorities under the Bhopal Bridge Zone. After evaluation of bids submitted by participating contractors, Shri Krishna and Company emerged as the bidder quoting the minimum value for execution of the project.
The total project value stands at Rs. 199,709,932.5, representing a significant investment in bridge infrastructure development. Upon completion, the bridge will improve regional connectivity, reduce travel disruptions during normal conditions, and support the socio-economic development of Morena district.
Key Points:
- Authority: PWD (Roads & Bridges), Madhya Pradesh
- Zone: Chief Engineer, Bridge Zone, Bhopal
- Project: Construction of Submersible Bridge across the Kunwari River with approach roads
- Location: Itaura–Sujarma Road, Morena District, Madhya Pradesh
- Contractor Name: Shri Krishna and Company
- Project Value: Rs. 199,709,932.5
- SINGLA CONSTRUCTIONS LIMITED Got A Project: Construction of Vehicular Overpass (VOP)/Bridge/Flyover from Convent Road
- K K Boora Construction Co Got A Project: Strengthening of Saharanpur-Kurukshetra (SH-06) Road (ID 559)
- Shree Girrajjee Infra Heights Private Limited Got A Project: Construction of 5 Nos. of Elephant Underpasses (EUP) in compliance to condition of Forest Department in Forest Clearance
- Jai Bharat Constructions Got A Project:RFP for Performance Based Maintenance Contract PBMC
- Shyama Construction Got A Project: Strengthening of existing NH-215 from km 266.640 to km 330.040