Shri Rjendra kumar Got a Project: Widening and Strengthening Road in Rajasthan.
Ram Chandra Paul Got A Project: Vivekanand School More to Ring Road via Jharkhand High Court Jharkhand Vidhan Sabha Road

The State Highway Authority of Jharkhand (SHAJ) invited a tender for the widening and strengthening of the Vivekanand School More to Ring Road road via Jharkhand High Court and Jharkhand Vidhan Sabha, covering a length of 6.089 km. The project also includes the widening and strengthening of the link road from Naya Sarai ROB to Ring Road, covering an additional 2.12 km, to a two-lane standard with paved shoulders.
The project aims to improve connectivity between major administrative and residential areas of Ranchi and strengthen links with the Ring Road. The scope of work includes pavement strengthening, carriageway widening, paved shoulder construction, drainage improvements, road safety measures, junction improvements, and other allied civil works.
As per the tender details, the financial bid was opened on 3 June 2026 by the State Highway Authority of Jharkhand. Following evaluation of the bids submitted by participating contractors, Ram Chandra Paul emerged as the bidder quoting the minimum value for execution of the project.
The total project value stands at Rs. 1,772,560,260, representing a major investment in Jharkhand’s road infrastructure. Once completed, the upgraded corridors are expected to improve traffic movement, strengthen connectivity to the Ring Road, reduce congestion, and provide safer and more efficient transportation in the Ranchi region.
Key Points:

  • Authority: State Highway Authority of Jharkhand
  • Project: Widening and strengthening of Vivekanand School More–Ring Road via Jharkhand High Court and Vidhan Sabha
  • Main Road Length: 6.089 km
  • Link Road: Naya Sarai ROB to Ring Road – 2.12 km
  • Standard: Two lanes with paved shoulders
  • Financial Bid Opening: 3 June 2026
  • Contractor Name: Ram Chandra Paul
  • Project Value: Rs. 1,772,560,260