The Chief Engineer, PWD Central Zone, Lucknow, along with the Superintending Engineer (UPPWD Lucknow) and the Provincial Division, Lucknow, invited a tender for a crucial urban infrastructure enhancement project. The work involves the strengthening of the service lane and underpass of Amar Shaheed Path, one of the most important traffic corridors in Lucknow. This stretch plays a vital role in reducing congestion and ensuring smoother travel across the district.
The project includes structural strengthening, pavement improvement, resurfacing, drainage correction, and reinforcing load-bearing sections to enhance the durability of the service lane and underpass. These works aim to improve road performance during peak traffic hours, ensure safety, and reduce the need for frequent maintenance. Strengthening Amar Shaheed Path is expected to contribute significantly to improved mobility within Lucknow.
The financial bid for the tender was opened on 12 October 2025 under the supervision of PWD Central Zone authorities. The project witnessed healthy participation from several contractors due to its importance in easing urban traffic flow and supporting daily commuter movement. Opening the bid marks a key procedural milestone in awarding the execution contract.
Among all bidders, M/s Raj Construction quoted the minimum value, emerging as the lowest bidder for the project. The total estimated cost of the strengthening works stands at Rs. 19,49,09,049, reflecting a notable investment toward enhancing critical transport infrastructure in Lucknow.
Key Points
- Tender issued by PWD Central Zone, Lucknow
- Project: Strengthening service lane and underpass of Amar Shaheed Path
- Includes pavement improvement and structural strengthening
- Financial bid opened on 12 October 2025
- Contractor Name: M/s Raj Construction
- Project value: Rs. 19,49,09,049
- M/s Anmol Associates Got A Project: Comprehensive Integrated Road Redevelopment of 2 Roads
- M/s Raj Construction Got A Project: Strengthening Work of Service Lane and Underpass of Amar Shaheedpath under CRIF in District Lucknow
- MUKESH VERMA Got A Project: Devlopment commercial 5 shops in old Etawah Road at satti talab
- GDS INFRASTRUCTURE Got A Project: Strengthening works by BM and BC in SH-60 PD
- Pavai Infra Geotech. Got A Project:TREATMENT OF 01 NOS LAND SLIDE ZONE KM 475.360 TOKM 475.625





