The Chief Engineer, PWD Central Zone, Lucknow, along with the Superintending Engineer (UPPWD Lucknow) and the Provincial Division, Lucknow, invited a tender for a crucial urban infrastructure enhancement project. The work involves the strengthening of the service lane and underpass of Amar Shaheed Path, one of the most important traffic corridors in Lucknow. This stretch plays a vital role in reducing congestion and ensuring smoother travel across the district.
The project includes structural strengthening, pavement improvement, resurfacing, drainage correction, and reinforcing load-bearing sections to enhance the durability of the service lane and underpass. These works aim to improve road performance during peak traffic hours, ensure safety, and reduce the need for frequent maintenance. Strengthening Amar Shaheed Path is expected to contribute significantly to improved mobility within Lucknow.
The financial bid for the tender was opened on 12 October 2025 under the supervision of PWD Central Zone authorities. The project witnessed healthy participation from several contractors due to its importance in easing urban traffic flow and supporting daily commuter movement. Opening the bid marks a key procedural milestone in awarding the execution contract.
Among all bidders, M/s Raj Construction quoted the minimum value, emerging as the lowest bidder for the project. The total estimated cost of the strengthening works stands at Rs. 19,49,09,049, reflecting a notable investment toward enhancing critical transport infrastructure in Lucknow.
Key Points
- Tender issued by PWD Central Zone, Lucknow
- Project: Strengthening service lane and underpass of Amar Shaheed Path
- Includes pavement improvement and structural strengthening
- Financial bid opened on 12 October 2025
- Contractor Name: M/s Raj Construction
- Project value: Rs. 19,49,09,049
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali




