PWD – CE AND AS, in coordination with ACE Kota, SE Baran, and EE Shahbad, invited a tender for the Widening and Double-Lane development of the road starting from NH-27 Balachar and passing through Niwari, Khatka, Ganeshpura, Semli Fhatak, Dhaturiya to Pahari, and Rajpur in Baran district. This project aims to upgrade an important rural–regional corridor to ensure safer and smoother mobility for residents and transport operators.
The work involves converting the existing stretch into a double-lane road, strengthening the pavement structure, improving geometric conditions, and developing necessary roadside safety features. The road serves several agricultural and semi-urban settlements, making it crucial for movement of goods, public transport, and essential services. With upgraded infrastructure, the route is expected to reduce travel delays and significantly enhance connectivity within Baran district.
The financial bid for the tender was opened on 11th September 2025 by the concerned officials of PWD – CE AND AS, ACE Kota, SE Baran, and EE Shahbad. The evaluation was conducted as per departmental norms, ensuring transparency and fair competition among the contractors. The project received strong participation due to its scope and regional importance.
Among all the bidders, M/s Jhanvi Construction Baran submitted the lowest quoted value. The total estimated project cost is Rs. 363,846,460.5, marking a substantial investment aimed at improving regional road infrastructure and supporting long-term development in Baran district.
Key Points
- Tender for Widening & Double-Lane work.
- Road stretch from NH-27 Balachar to Rajpur.
- Major villages covered: Niwari, Khatka, Ganeshpura, Semli Fhatak, Dhaturiya, Pahari.
- Financial bid opened on 11 September 2025.
- Contractor Name: M/s Jhanvi Construction Baran.
- Project value: Rs. 363,846,460.5
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali




