The Public Works Region – Aurangabad, through its Public Works Circle and Public Works Division, has invited a tender for a major road development project aimed at enhancing connectivity near Aurangabad city. This project involves the construction of a four-lane road from Nagarnaka Padegoan to Daulatabad T-point, connecting to NH-52 (Old NH-211). This is the second call for the tender, underscoring the importance of the project for regional traffic decongestion and smoother vehicular movement.
The proposed road will provide a crucial link between key routes, supporting both local and long-distance traffic. The development is expected to ease the traffic load on existing roads, improve safety, and contribute to the overall economic growth of the Aurangabad region by facilitating better movement of goods and passengers.
The financial bid for this tender was opened on 19th May 2025. After evaluating the bids, GNI Infrastructure Pvt. Ltd. (JV) emerged as the lowest bidder, fulfilling the technical and financial requirements specified by the Public Works Department. Their competitive bid positions them as the frontrunner for the award of this significant contract.
Key Points:
- Construction of four-lane road near Aurangabad.
- Connects Nagarnaka Padegoan to Daulatabad T-point (NH-52).
- Tender issued by PWD Aurangabad Region/Circle/Division.
- Financial bid opened on 19th May 2025.
- Contractor Name: GNI Infrastructure Pvt. Ltd. (JV).
- Project value: ₹1,423,917,834.
- M/s Sildiliya Construction Got A Project: Widening Strengthening Reconstruction of Ghanghri to Koleshwari Temple via Dantar Road from KM 0.00 to 10.935
- Ramprasad Rathore Contractor & Suppliers Got A Project: Upgradation of Kalpi Chhindgaon Pipariya Road Length 31.30 KM. Including Electrification Work.
- Ravi Shankar Jaiswal Got A Project: Upgradation of Balpur Dhanora Road Length 17.50 KM. Including Electrification Work
- M/s Dilip Singh Raghuvanshi Got A Project: Construction of Gotegaon Dhooma MDR Road Length 18.60 KM.
- Manish Agrawal Got A Project: CONSTRUCTION OF UJJAIN TIRAHA TO NAGUKHEDI ROAD LENGTH 3.70 KM WITH ELECTRIFICATION WORK DIVISION NEEMUCH





