The PWD – CE & AS, ACE Ajmer, SE Tonk, and EE Tonk invited a tender for the Widening and Strengthening work of the Jhilai to Bahad road up to the District Border via Khidgi, Bassi, and Kheda in District Tonk. This road plays a crucial role in regional connectivity, linking multiple villages and supporting daily movement for residents, transporters, and local businesses. Upgrading this important stretch is essential to improve traffic flow, enhance safety, and ensure long-term durability in line with growing transportation needs of the district.
The proposed widening and strengthening will significantly improve riding comfort, reduce travel time, and boost economic activities by creating smoother access between rural and semi-urban areas. As Tonk district continues to expand in agricultural and commercial sectors, improved road infrastructure remains vital for sustained development.
The financial bid for the project was opened on 16th September 2025 by the competent authorities under the PWD Ajmer Zone. Among all the bidders, Shiv Charan Sharma emerged as the lowest bidder, securing the position to execute the project. The project value has been finalized at ₹201,970,532.3, reflecting the scale and importance of the work planned along this strategic route.
Key Points:
- Department: PWD – CE & AS, ACE Ajmer, SE Tonk, EE Tonk
- Project: Widening & Strengthening of Jhilai–Bahad Road
- Bid Opening Date: 16th September 2025
- Contractor Name: Shiv Charan Sharma
- Project Value: ₹201,970,532.3
- Location: District Tonk
- Nityanta Infra projects Private Limited Got A project: Construction of High Level Bridge Across Runj River in KM 2 on Guchhara to Kalyanpur Road
- H N Choudhary Construction Private Limited Got A Project: IRQP/Strengthening Work of Raghunathpur to Barmasia Road
- Dilip Kumar Got A Project: Re-construction work (including bridge construction) of Kumharia more
- Manoj Kumar Singh Got A Project: Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road
- Chitra Construction Got A project: IRQP Work for Harinchara more (SH-18) to Barhait (MDR-211) from KM 0.00 to 23.60 and Kherwa Shivgadi Link Road


