The Ujjain Development Authority (UDA) under the Directorate of Town and Country Planning invited a tender for the widening of the Ankapaat Chouraha–Khakchouk Chouraha to Mangalnath Marg in Ujjain, Madhya Pradesh. The project is intended to improve the capacity and efficiency of this important road corridor and strengthen connectivity within the city.
The scope of work includes widening of the existing roadway, pavement strengthening, improvement of drainage facilities, road safety measures, junction improvements, and other allied civil works. The project is expected to improve traffic movement, reduce congestion, and provide better connectivity towards the Mangalnath area.
According to the tender details, the financial bid was opened on 17 June 2026 by the Ujjain Development Authority. Following evaluation of the bids, Atul Kurariya Private Limited emerged as the bidder quoting the minimum value for execution of the project.
The total project value stands at Rs. 340,801,135.2, representing a significant investment in Ujjain’s urban road infrastructure. Once completed, the widened road is expected to improve traffic flow and accessibility while supporting the city’s ongoing urban development.
Key Points:
- Authority: Ujjain Development Authority (UDA)
- Project: Widening of Ankapaat Chouraha–Khakchouk Chouraha to Mangalnath Marg
- Location: Ujjain, Madhya Pradesh
- Financial Bid Opening: 17 June 2026
- Contractor Name: Atul Kurariya Private Limited
- Project Value: Rs. 340,801,135.2
- Shri Swami Samarth Engineers Limited Got A Project: Construction of cement concrete approach road from Talegaon Industrial Area Phase-I to Phase-IV
- Atul Kurariya Private Limited Got A Project: ANKAPAT CHOURAHE KHAKCHOUK CHOURAHE TO MANGALNATH MARGH WIDENING WORK UJJAIN
- Atul Kurariya Private Limited Got A Project: Proposed construction of a 9-meter-wide road with a length of 6.1 km on the eastern side of the Kshipra River.
- Ram Chandra Paul Got A Project: Vivekanand School More to Ring Road via Jharkhand High Court Jharkhand Vidhan Sabha Road
- Excel Venture Construction Got A Project: Improvement of Riding Quality Programme (IRQP) work of Simdega Rengari Kersai Bolba Orissa Border Road Total length 48.21 KM
