The Haryana Government, through the Engineer-in-Chief, PW (B&R) Department, along with the Superintending Engineer, Karnal, and the Executive Engineer, Provincial Division, Panipat, has invited a tender for the construction of guide bunds to protect an existing high-level bridge on the Yamuna River. This bridge plays a vital role in connecting Bilaspur to Khojkipur in District Panipat, serving as a key rural and regional link between Haryana and Uttar Pradesh.
The project also includes the improvement of the Samalkha–Atta (Haryana)–Nagal (U.P.) road, covering a stretch from km 0.00 to km 15.213. This road passes through the revenue estates of Atta, Khojkipur, Banoli, and Nangal, supporting inter-state connectivity and providing an essential route for local communities, agricultural transport, and regional movement.
The financial bid opened on 28th October 2025, with the tender being managed by the Haryana Public Works (B&R) authorities. Several contractors participated due to the project’s strategic importance in ensuring long-term bridge safety and improving road infrastructure across the Yamuna corridor.
After evaluation of bids, Vijay Kansal Contractor emerged as the lowest bidder. The total project value is Rs. 309,921,032, reflecting a significant investment aimed at strengthening protection measures, enhancing traffic flow, and improving cross-border connectivity between Haryana and Uttar Pradesh.
Key Points
- Tender invited by Haryana PW (B&R) Department, SE Karnal & EE PD Panipat
- Construction of guide bunds for the HL Bridge on Yamuna River
- Strengthening link between Bilaspur and Khojkipur
- Road improvement from km 0.00 to 15.213 via multiple villages
- Financial bid opened on 28th October 2025
- Contractor Name: Vijay Kansal Contractor
- Project value Rs. 309,921,032
- Aquatic Pump Industries Got A Project: for Construction of High Level Pedestrian Suspension Bridge Across Narmada River
- Satya Parkash and Bros Pvt Ltd Got A Project: Remodelling of drain based on Delhi Master Drainage Plan-2025 from G.T.K. to Gali No.01
- Bindal Developers Got A project: CONSTRUCTION OF RAJODA KELOD DOUBLE CHOWKI ROAD LENGTH 31.74 KM DIVISION DEWAS
- SVK Infrastructures Got A Project: Remodeling of drains based on Delhi Master Drainage Plan-2025 from Sanjay Gandhi Transport Nagar (GTK NH 44) to Samaypur Badli Underpass
- Raisingh and Company Got A project: Construction of Katangi Lalbarra Road Length 40.00 KM. (CC Road) Including Electrification Work




