The Haryana Government, through the Panchkula Metropolitan Development Authority (PklMDA) and its Construction Division-2, invited a tender for the Construction of a High-Level (H.L.) Bridge adjacent to the existing bridge on the Ghaggar River. This bridge will connect the dividing road of Sector 3 and Sector 21 with Sector 23 and Sector 25 near the Panchkula Golf Club in Haryana. The project will be executed under the Engineering, Procurement, and Construction (EPC) mode, ensuring efficient coordination from design to completion.
The proposed bridge aims to enhance traffic flow and connectivity between key sectors of Panchkula, reducing congestion and improving commuter safety. It will serve as an important infrastructure link in the city’s growing transport network, especially for residents and visitors near the Golf Club area. The project also focuses on ensuring structural stability and effective water flow management of the Ghaggar River during peak monsoon seasons.
The financial bid for this crucial infrastructure project was opened on 16th September 2025 by PklMDA (Construction Division-2). The minimum value was quoted by Tejwant Rai Govt Contractor, with the total project cost estimated at ₹216,270,644.6 (₹21.63 crore).
Key Points:
- Authority: Haryana Government (PklMDA)
- Division: Construction Division-2
- Contractor Name: Tejwant Rai Govt Contractor
- Work: Construction of H.L. Bridge on Ghaggar River (EPC Mode)
- Financial Bid Opening: 16th September 2025
- Project Value: ₹216,270,644.6
- Technogem Consultants Pvt. Ltd Got A Project: Appointment of Project Management Consultancy Services for the balance length of Construction of Kalyan Ring Road Segment
- Shri Krishna and Company Got A Project: Construction of Submersible Bridge Including Approach Road Across Kunwari River on Itaura-Sujarma Road
- Atul Kurariya Private Limited Got A Project: Construction of MDR-12-02 Chitrangi to Chitawal, Tamai, Jharkata, Barwadih, (Ghorawal) UP border, road length 45.20 km.
- Construction of MDR-12-02 Chitrangi to Chitawal, Tamai, Jharkata, Barwadih, (Ghorawal) UP border, road length 45.20 km.
- Raisingh and Company Got A Project: Construction of Railway Over Bridge at Railway Crossing no. 269 at KM 937/28-30 Amla-Nagpur Section on Amravati road

