6 C
London
Wednesday, January 26, 2022

Nagaland

- Advertisement -

NHIDCL Project in Nagaland, National Highways and Infrastructure Development given the project to C Gopal Reddy and Co in Nagaland

Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland

NHIDCL project, Oasis Technocons Ltd got the road project in Nagaland for Rs. 111.197Cr

Balance work for Four-laning of NH-39 Dimapur- Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III)

C Gopal Reddy and Co got the project by National Highways and Infrastructure Development in Nagaland for Rs.117.50Cr

Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP

M/s DIVYA SIMANDHAR CONSTRUCTION PVT. LTD got the project in Nagaland for the value of Rs.107.185 Cr.

Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900),
- Advertisement -

Must Read

NHAI New Consturction of 4 Lane Elevated corridor in Lucknow-Sitapur

Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24...
- Advertisement -

M/s JKM INFRA WORKS LLP Got Widening/Improvement to 4 (Four) Lane with Paved Shoulder in the state of Assam

Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7)...

Construction of new 2 Lane Major Bridge in the State of Bihar

Construction of new 2 Lane Major Bridge with its approaches from design Chainage 0.000 to 2.150 across River Sone in the State...

M/s PUNA HINDA Gets Construction of Balance Work of 2 Lane with Paved Shoulders in the State of Arunachal Pradesh

Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00...

Welcome To Subinfra

Get information of Exclusive Projects
Hurry Now!!!