The Ministry of Road Transport and Highways (MoRTH), through P1 Delhi, Regional Office Chandigarh, and NH Chandigarh PWD (NH Section), has invited a tender for the work of Sohna realignment of the Rewari–Sohna–Palwal Road on NH-919 (Old NH-71B) from Km 47.100 to Km 49.350 in the Sohna hilly portion of Haryana. The project is proposed to be executed on Engineering, Procurement, and Construction (EPC) mode to ensure timely delivery and quality control.
This realignment project is strategically important as the existing stretch passes through hilly terrain, which often poses challenges related to safety, alignment geometry, and traffic movement. The proposed improvement will enhance road safety, improve riding comfort, and ensure smoother vehicular flow on this vital corridor connecting Rewari, Sohna, and Palwal. The project will also help reduce accident risks and improve long-term durability of the national highway infrastructure in the region.
The financial bid for the tender was opened on 30th October 2025 by MoRTH under the supervision of P1 Delhi, RO Chandigarh, and NH Chandigarh PWD (NH Section). Following the bid evaluation process, Suraj Construction Company emerged as the lowest bidder, quoting the minimum value for execution of the project. The tendering process was conducted in accordance with standard procurement norms to maintain transparency and competitiveness.
The total project cost is Rs. 98,927,215, reflecting a focused investment in improving national highway infrastructure in Haryana. Upon completion, the project is expected to enhance connectivity, improve travel efficiency, and support economic and transport activities in the Sohna region.
Key Points:
- Tender invited by Ministry of Road Transport and Highways (MoRTH)
- Offices involved: P1 Delhi, RO Chandigarh, NH Chandigarh PWD (NH Section)
- Project: Sohna realignment of NH-919 (Old NH-71B)
- Stretch length: Km 47.100 to Km 49.350
- Mode of execution: EPC
- Contractor Name: Suraj Construction Company
- Project value: Rs. 98,927,215
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali
- M/s Foujdar Constt. Co Got A Project:FOUR LANE CONSTRUCTION WORK OF BHARATPUR ACHHANERA ROAD




