The Public Works Road Department, Assam, has opened the doors for tenders to build a much-anticipated flyover at Amolapatty Junction on Old NH-37 in the bustling Dibrugarh District. This project isn’t just about concrete and steel; it’s about making daily commutes smoother, cutting down traffic jams, and connecting people more efficiently.
The financial bid for this important project is set to open on 3rd February 2025, with the estimated project cost around INR 963,764,438.1. It’s a big investment, but it’s aimed at transforming the way people move through one of Assam’s key districts.
Interestingly, the lowest bid so far has been quoted by Contractor Kishore Borah, setting the stage for a competitive process. This is a great opportunity for contractors to be part of a project that will leave a lasting impact on the region’s infrastructure.
The flyover will be a game-changer, helping to ease congestion at Amolapatty Junction, which is often a traffic hotspot. By reducing travel time and improving road safety, it will not only boost local mobility but also support economic growth in the area.
Key Points:
Project: Construction of a flyover at Amolapatty Junction on Old NH-37.
Location: Dibrugarh District, Assam.
Issuing Authority: Public Works Road Department (PWRD), Assam.
Financial Bid Opening Date: February 3, 2025.
Contractor Name : Kishore Borah
Project Value (Approximate): INR 963,764,438.1.
- Ganesh Prasad Khetan Got A Project: Construction and Up-gradation to Two lane with paved shoulder In km 90.990 to 98.160
- Ganesh Prasad Khetan Got A Project: Construction and Up- gradation to Two lane with paved shoulder In km 98.160 to 105.330
- RMPL Construction Company Got A Project: Performance base Maintenance Contract between km 181/600 to 221/800 of NH-41
- V. T. Dinesh Kumar Got A Project: Strengthening of the road stretch from Km 132 324 to Km 213 000
- Dipankar Dey Got A Project: IMPROVEMENT OF ROADS AND STROM WATER DRAINAGE SYSTEM IN MELAGARH
- Ganesh Prasad Khetan Got A Project: Construction and Up-gradation to Two lane with paved shoulder In km 90.990 to 98.160
- Ganesh Prasad Khetan Got A Project: Construction and Up- gradation to Two lane with paved shoulder In km 98.160 to 105.330
- RMPL Construction Company Got A Project: Performance base Maintenance Contract between km 181/600 to 221/800 of NH-41
- V. T. Dinesh Kumar Got A Project: Strengthening of the road stretch from Km 132 324 to Km 213 000
- Dipankar Dey Got A Project: IMPROVEMENT OF ROADS AND STROM WATER DRAINAGE SYSTEM IN MELAGARH
Stay tuned for further updates on this developing story as the PWD proceeds with the tender process and construction of this vital infrastructure project.



