The Public Works Department – Roads and Bridges, under the Bhopal Chief Engineer (Bridge Zone), has invited a tender for the construction of a Railway Over Bridge (ROB) at Level Crossing No. 07, located between Km 7/19–21 near Vikram Nagar Railway Station on the Ujjain–Dewas Broad Gauge railway track in District Ujjain. This project is aimed at improving road safety and eliminating traffic disruptions caused by frequent railway crossings.
The scope of work includes the complete construction of the ROB, along with shifting of electrical utilities, such as HT/LT lines, transformers (Xmers), and the installation of street lighting. The project will help ensure smooth and uninterrupted vehicular movement, reduce congestion, and enhance commuter convenience in the Vikram Nagar area.
The financial bid for this tender opened on 4th October 2025, under the supervision of the PWD Roads and Bridges wing of the Bhopal CE Bridge Zone. The tender received competitive participation due to its technical scope and importance for urban traffic management. After bid evaluation, Paresh S. Patel was declared the lowest bidder.
The total project value stands at Rs. 259,863,490.6, representing a substantial investment in transport infrastructure for Ujjain district. Once completed, the ROB will significantly improve connectivity, enhance safety, and support long-term urban development along the Ujjain–Dewas corridor.
Key Points
- Tender invited by PWD Roads & Bridges, Bhopal CE Bridge Zone
- Construction of Railway Over Bridge at LC No. 07, Ujjain district
- Location: Km 7/19–21 near Vikram Nagar Railway Station
- Scope includes electrical pole shifting and street lighting
- Financial bid opened on 4th October 2025
- Contractor Name: Paresh S. Patel
- Project value: Rs. 259,863,490.6
- Kamal Builders Got A Project:Widening and Strengthening work Bas Burja to Deeg (Panhori) Road via Govindgarh Padalwas Kakda Panhori
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali




