NHIDCL award work order for construction of Balance work of Two-lane with paved shoulder of Joram-Koloriang Road (NH-713) on EPC Basis

Project Details – Construction of Balance work of Two-lane with paved shoulder of Joram-Koloriang Road (NH-713) on EPC Basis from existing Km 50.050 to km 70.000 [Design Km44+000 to Km 59.363]( Design length-15.363 Km)  the State of Arunachal Pradesh under SARDP-NE

NHAI Running Project Report

 State Name  – Arunachal Pradesh 

Department Name – National Highways and Infrastructure Development Corporation||Corporate Office-New Delhi – NHIDCL

Project Value – 1002076789

 Date of Financial Bid Opening – 8/7/2020

 Contractor Name – M/S Valecha Engineering Limited

Total
1
Shares
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Previous Article
PEB

MES award work order for shed and re-construction of existing sheds along with the provision of IGLOO sheds at AMBALA

Next Article

NHIDCL award work order widening/Improvement to 4 (Four) Lane

Related Posts
Read More

उत्तर प्रदेश में 7477 करोड़ कीमत के 16 राष्ट्रीय राजमार्ग परियोजनाओं का शिलान्यास, कार्य शुभारम्भ और लोकार्पण करेंगे नितिन गडकरी आज.

केंद्रीय मंत्री श्री Nitin Gadkari जी और उत्तर प्रदेश के मुख्यमंत्री श्री MYogiAdityanath जी 26 नवंबर 2020, गुरुवार, शाम 4 बजे उत्तर…
0
Would love your thoughts, please comment.x
()
x
Sign In to get contractor Details
OR