The Municipal Corporation of Greater Mumbai (MCGM), through its Sewerage Operation Department, Dy. Ch.E (Civil) Sewerage Operation, and Ex. Engineer Sewerage Operation (Civil) Planning and Construction, invited a tender for general structural and civil repair works at the Nehru Road Drop Shaft, Nehru Road, Santacruz (East), and the Khar Drop Shaft, Golibar Road, Santacruz (East), located in the H/East Ward under the jurisdiction of the Chief Engineer (Sewerage Operations) Department.
The project focuses on restoring and reinforcing critical sewerage infrastructure to ensure efficient wastewater management and structural stability. The repair works will include strengthening of existing civil structures, leakage prevention, concrete rehabilitation, and other essential civil repairs. These improvements are aimed at enhancing the long-term functionality and safety of the sewerage network, preventing overflow or blockages, and maintaining hygienic urban conditions in Santacruz (East).
The financial bid for the project was opened on 3rd September 2025 by the Municipal Corporation of Greater Mumbai (MCGM) under the Sewerage Operation Department. The lowest bid was quoted by Mahakali Enterprises. The total project value is ₹4,270,930.9 (₹42.70 lakh).
Key Points:
- Department: MCGM Sewerage Operation Department
- Location: Santacruz (East), H/East Ward
- Scope: Structural & civil repair works
- Bid Opening Date: 3rd September 2025
- Contractor Name: Mahakali Enterprises
- Project Value: ₹4,270,930.9
- AK SHIVHARE INFRASTRUCTURE PVT LTD Got A Project: Construction of Submersible Bridge Including Approach Road Across Hiran River on Bankhedi-Kakretha Road
- SINGLA CONSTRUCTIONS LIMITED Got A Project: Construction of Vehicular Overpass (VOP)/Bridge/Flyover from Convent Road
- K K Boora Construction Co Got A Project: Strengthening of Saharanpur-Kurukshetra (SH-06) Road (ID 559)
- Shree Girrajjee Infra Heights Private Limited Got A Project: Construction of 5 Nos. of Elephant Underpasses (EUP) in compliance to condition of Forest Department in Forest Clearance
- Jai Bharat Constructions Got A Project:RFP for Performance Based Maintenance Contract PBMC