The Ministry of Road Transport and Highways (MoRTH), through its P6 Delhi office in coordination with RO Mumbai and NH Division–Akola, has invited a tender for a Performance-Based Maintenance Contract (PBMC). The project focuses on the maintenance of the Khamgaon to Deulgaon Sakarsha section of National Highway-548C in Maharashtra. The total project length is 28.90 km, covering km 0.000 to km 28.300 and km 32.100 to km 32.700.
This section of NH-548C features a two-lane road with paved shoulders and is an important route for local and regional traffic. Under the PBMC framework, the selected contractor will be responsible for maintaining road performance standards over a specified period. This includes surface repairs, upkeep of road shoulders, drainage systems, and ensuring overall safety and usability.
The objective of the PBMC model is to ensure cost-effective, long-term road maintenance by holding the contractor accountable for performance outcomes rather than individual tasks. This approach aims to enhance efficiency, extend road life, and provide better value for public investment.
The financial bid for this contract was opened on April 30, 2025. M/s. Tulsi Narayan Garg submitted the lowest quote and was declared the L1 bidder. The estimated value of the project is ₹17,37,10,415.
Key Points:
- Tendering Authority: MoRTH – P6 Delhi, RO Mumbai, NH Division–Akola.
- Project Type: Performance-Based Maintenance Contract (PBMC).
- Location: Khamgaon to Deulgaon Sakarsha, NH-548C, Maharashtra.
- Road Type: Two-lane with paved shoulders.
- Financial Bid Opening: April 30, 2025.
- Contractor Name: M/s. Tulsi Narayan Garg
- Project Value: ₹17,37,10,415.
- M/s Choyal Construction Got A Project:Widening and Strengthening Work from Kharnal to Dhundhiyadi
- M/S Mahaveer Godara Got A Project:Widening and Strengthening on Kasnau to Dehri
- Ganpati Construction Company Got A Project: CONSTRUCTION OF SKILL TRAINING INSTITUTE AT DOOMDOOMA IN TINSUKIA DISTRICT on Engineering, Procurement and Construction (EPC) Mode-I Basis
- Kalsi Brothers Got A Project: Planning Designing and obtaining all local body approvals and Construction of Lecture hall complex 2
- Kamal Builders Got A Project:Construction of four lane road railway station to Mathura bypass left out portion (SH-01)Bharatpur Mathura Road




