The Ministry of Road Transport and Highways (MoRTH), through P1 Delhi, Regional Office Shimla, and Circle Shahpur, has invited a tender for the construction of a bridge over the Swan River at Km 13.450 on National Highway-503A in District Una, Himachal Pradesh. This project is aimed at strengthening highway infrastructure and improving connectivity across an important river crossing in the region.
The proposed bridge will play a crucial role in ensuring uninterrupted vehicular movement on NH-503A, which serves as a key route for commuters, freight transport, and regional traffic. Construction of a modern bridge structure over the Swan River will enhance safety, reduce travel disruptions during monsoon seasons, and support smoother transportation of goods and passengers. The project will also improve disaster resilience and long-term durability of the highway network.
The financial bid for the tender was opened on 28th October 2025 by MoRTH under the administrative supervision of P1 Delhi, RO Shimla, and Circle Shahpur. After evaluation of bids, M/s Satish Kumar Sharma, Government Contractor, emerged as the lowest bidder, quoting the minimum value for execution of the work. The tender process was carried out in accordance with established procurement guidelines to ensure transparency and fairness.
The total project cost is Rs. 185,399,997, representing a significant public investment in national highway infrastructure in Himachal Pradesh. Upon completion, the bridge is expected to improve connectivity in Una district, enhance road safety, and contribute to regional economic development.
Key Points:
- Tender invited by Ministry of Road Transport and Highways (MoRTH)
- Offices involved: P1 Delhi, RO Shimla, Circle Shahpur
- Project: Construction of bridge over Swan River
- Location: Km 13.450 on NH-503A, District Una (HP)
- Financial bid opened on: 28 October 2025
- Contractor Name: M/s Satish Kumar Sharma (Govt Contractor)
- Project value: Rs. 185,399,997
- Satya Parkash and Bros Pvt Ltd Got A Project: Remodelling of drain based on Delhi Master Drainage Plan-2025 from G.T.K. to Gali No.01
- Bindal Developers Got A project: CONSTRUCTION OF RAJODA KELOD DOUBLE CHOWKI ROAD LENGTH 31.74 KM DIVISION DEWAS
- SVK Infrastructures Got A Project: Remodeling of drains based on Delhi Master Drainage Plan-2025 from Sanjay Gandhi Transport Nagar (GTK NH 44) to Samaypur Badli Underpass
- Raisingh and Company Got A project: Construction of Katangi Lalbarra Road Length 40.00 KM. (CC Road) Including Electrification Work
- JSP Projects Private Limited Got A Project: Construction of Underpass at Loni Chowk of Mangal Pandey Marg, including Footpath, Road Work, Road Signages, Drainages, Rain Water Harvesting, roof covering, water proofing, Electrical Works and Allied Works.



