PWD – CE AND AS, in association with ACE Kota, SE Baran, and EE Baran, invited a tender for the Widening and Strengthening of the Chhipabarod–Jhanjhani–Umariya via Pithpur Road in Baran district. This project aims to upgrade an important regional corridor that supports daily transportation, agricultural movement, and local trade activities across multiple rural settlements in the district.
The proposed work includes widening the existing carriageway, strengthening the base and pavement layers, constructing drainage structures, and improving overall road geometry to meet current traffic standards. With Baran district witnessing steady growth, improving this road is crucial for ensuring safer travel, reducing congestion, and enhancing mobility for residents, transport operators, and local businesses. Better connectivity along this route will support socio-economic development and streamline regional transport operations.
The financial bid for this tender was opened on 11th September 2025 by officials from PWD – CE AND AS, ACE Kota, SE Baran, and EE Baran. The evaluation process adhered to departmental protocols, ensuring transparency and fair competition among participating contractors. Several firms expressed interest due to the project’s scope and regional significance.
Among all bidders, M/s S R and Company quoted the minimum value for completing the project. The total estimated project cost stands at Rs. 189,727,660.7, marking a notable investment toward strengthening rural road infrastructure and improving long-term transport efficiency in Baran district.
Key Points
- Tender for Widening & Strengthening of Chhipabarod–Jhanjhani–Umariya Road.
- Located in Baran district.
- Includes improvement via Pithpur.
- Financial bid opened on 11 September 2025.
- Contractor Name: M/s S R and Company.
- Project value: Rs. 189,727,660.7
- H N Choudhary Construction Private Limited Got A Project: IRQP/Strengthening Work of Raghunathpur to Barmasia Road
- Dilip Kumar Got A Project: Re-construction work (including bridge construction) of Kumharia more
- Manoj Kumar Singh Got A Project: Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road
- Chitra Construction Got A project: IRQP Work for Harinchara more (SH-18) to Barhait (MDR-211) from KM 0.00 to 23.60 and Kherwa Shivgadi Link Road
- Aquatic Pump Industries Got A Project: for Construction of High Level Pedestrian Suspension Bridge Across Narmada River


