The Chief Engineer, Devipatan (Gonda) Zone, PWD Gonda, along with the Superintending Engineer, Gonda Circle, PWD Gonda, has invited a tender for the Widening and Strengthening work from Km 1 to 9 of the Uttaraula–Tulsipur Road (ODR). This road plays a vital role in providing regional connectivity between Uttaraula and Tulsipur, facilitating smooth movement for residents, traders, and daily commuters across the area. The proposed upgrade aims to improve road safety, enhance ride quality, and support local economic activity.
The project includes widening the existing road width, strengthening pavement layers, improving surface durability, and developing proper drainage systems along vulnerable stretches. Additional works such as shoulder improvement, cross-drainage structures, and road safety installations are planned to meet operational and structural requirements. These improvements will create a more resilient and efficient route capable of handling increasing traffic loads.
The financial bid opening is scheduled for 24th September 2025, under the supervision of the Chief Engineer, Devipatan Zone, and the SE, Gonda Circle. During financial evaluation, M/s Jai Prakash Singh Contractor emerged as the bidder with the minimum quoted value, meeting the tender’s competitive and technical conditions.
The total project value is ₹185,398,795.8, reflecting a significant investment toward strengthening this key ODR link. Once completed, the upgraded stretch will improve accessibility, reduce travel time, and boost socio-economic connectivity between Uttaraula and Tulsipur.
Key Points
- Tender invited by CE Devipatan Zone & SE Gonda Circle
- Project: Widening & Strengthening of Uttaraula–Tulsipur Road (Km 1–9)
- Financial bid opening on 24 September 2025
- Contractor Name: M/s Jai Prakash Singh Contractor
- Project value: ₹185,398,795.8
- Enhances durability, safety, and regional connectivity
- R K ASSOCIATES Got A Project: Improvement such as widening and strengthening of Pipili-Jatani road
- Mukesh Kumar Got A Project: Improvement such as widening and strengthening of Laikera-Sahaspur-Bamra road
- KBM Construction Got A Project: Improvement to Telkoi-Akul-Bhimkund road in the district of Keonjhar under MMSY-DRR
- Nanda Infra Construction Private Limited Got A Project:Widening and strengthening of Badachana Darpani road
- Shree Associates Infraventures Limited Got A Project: Improvements to Bhimashankar pilgrimage connecting road – Vandre Amboli Pait Shiroli Road

