The Public Works Department (PWD) – Roads and Bridges, under the Ujjain CE Ujjain Zone, has issued a tender for the construction of four-laning of the A.B. Road (Old NH-3) in the Maksi city portion, covering a total stretch of 5.65 kilometres. The project also involves pole shifting work to accommodate the widened carriageway. It falls under the jurisdiction of the Division Shajapur.
The initiative is aimed at enhancing road capacity, easing congestion, and improving safety standards for both local and through traffic. The four-lane configuration will ensure smoother vehicular movement, while the pole shifting is an essential step in creating an obstruction-free and efficient transport corridor.
The tender process was conducted by PWD – Roads and Bridges, Ujjain CE Ujjain Zone, with the financial bid opening scheduled for 28th July 2025. The project attracted bids from competent contractors with expertise in urban road widening and related utility relocation works.
After evaluation, Kushwah Construction Company emerged as the lowest bidder, securing the opportunity to execute the project. Their selection reflects the department’s trust in their ability to deliver a high-quality outcome within the designated timeframe.
The total estimated value of the project is ₹27,90,50,995.6, marking it as a key investment in strengthening urban road infrastructure in Maksi city.
Key Points:
- Project: Four-laning of A.B. Road (Old NH-3) in Maksi city portion
- Road Length: 5.65 km
- Includes: Pole shifting works
- Division: Shajapur
- Contractor Name: Kushwah Construction Company
- Project Value: ₹27,90,50,995.6
- M/s Choyal Construction Got A Project:Widening and Strengthening Work from Kharnal to Dhundhiyadi
- M/S Mahaveer Godara Got A Project:Widening and Strengthening on Kasnau to Dehri
- Ganpati Construction Company Got A Project: CONSTRUCTION OF SKILL TRAINING INSTITUTE AT DOOMDOOMA IN TINSUKIA DISTRICT on Engineering, Procurement and Construction (EPC) Mode-I Basis
- Kalsi Brothers Got A Project: Planning Designing and obtaining all local body approvals and Construction of Lecture hall complex 2
- Kamal Builders Got A Project:Construction of four lane road railway station to Mathura bypass left out portion (SH-01)Bharatpur Mathura Road




