Karnataka Road Projects

V.K.Gupta and Associates Got a New Project
NHIDCL/JK/ NH-144A/J-A/Pkg-IIIB/ /2022-23//NHIDCL/JK/ NH-144A/J-A/Pkg-IIIB/ /2022-23

Braham Prakash Modi Got a New Project
Construction of Mihona bypass, Lahar bypass, Daboh bypass and Bhander Bypass (total length 20.60 km) to 2-lane with paved shoulder from on Mihona-Bhander-MP/UP border section of NH 552E in the State of Madhya Pradesh 02 /SAC/Tender/NH/2022-23

Tara Tarini Constructions Pvt Ltd Got a New Project in Odisha
Construction of four lane Bypass to Jeypore town on NH-26 in the state of Odisha on EPC Mode under Annual plan of 2021-22 23 CE NH of 2022-23

Technocrats Advisory Services Pvt. Ltd. Got New Project in Assam
PMC for 4 lane NH 15 from Baihata Chariali to Start Mangaldoi Bypass connecting NH-15 to NH-27 ( old NH-31 ) (Missing Link) with Junction design and 4 lane of NH-15 from Mangaldoi (excluding Mangaldoi bypass) to Mission Chariali of NH-15 RW/GHT/PMC/DPR/Tender/AS/646

Thakur Buildtech Private Limited Got a New Project in Odisha
Construction of two lane with paved shoulders from km 56/860 to km 68/369 of NH-59 (Rigdol to Belgaon) in the state of Odisha under EPC Mode 20 CE NH of 2022-23

Shivam Condev Private Limited Got a New Project in Odisha
Construction of Railway over Bridge at Km 60.200 of NH316 Km 3.2 of Old NH203E at Matiapada on Puri Konark Road, KP42 of Khurdha Puri Rail Line in the state of Odisha under EPC Mode 16 CE NH of 2022-23

Shivam Condev Private Limited Got New Project in Odisha
Construction Bypass to Bhawanipatna town from km 171.805 to km 184.190 of NH26 in the state of Odisha on EPC mode 19 CE NH of 2022-23

Ram Chandra Paul Got a New Project
Construction of ROB at km 154.831 of NH-75E between Singhpokharia and Jhinkpani railway station (LC No. RBK-21) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/Ranchi/2021-22-317). NH/CHAIBASA /EPC/01/2022-23

Ram Chandra Paul Got a New Project in Jharkhand
Construction of ROB at km 168.954 of NH-75E between Talaburu and Kendposi railway station (LC No. RBK-30) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-315). NH/CHAIBASA /EPC/04/2022-23

Ram Chandra Paul Got a New Project in Jharkhand
Construction of ROB at km 164.444 of NH-75E between S Jhinkpani and Talaburu railway station (LC No. RBK-26) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-320). NH/CHAIBASA /EPC/03/2022-23

Shivam Condev Private Limited Got a New Project in Odisha
Construction of Bypass to Nayagarh town from km 235.469 to km 252.482 of NH-57 in the state of Odisha on EPC mode 11 CENH of 2022-23

Chaudhary Construction Company Private Limited Got a New Project
Dte General Border Roads Organisation||HQ (CE) P Shivalik(Rishikesh) – BRO

Geo Designs and Reserch Pvt. Ltd. Got a New Project in Nagaland
PMC Services for preparation of DPR, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung to Zunheboto, Chozuba to Phek and from Losami Junction to Meluri on NH-702A in the State of Nagaland RW/GHT/NG/PMC/702A/2022-23/260

SBCC INFRA PRIVATE LIMITED Got a New Project in Madhya Pradesh
Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, From Km 82.300 to 89.880,Total design length 7.580 Kml section of NH-752C in the State of Madhya Pradesh under EPC mode 07 /SAC/Tender/NH/2022-23

Kalyan Toll Infrastructure Limited Got a New Project
Rehabilitation and Up-gradation to 4 lane Road with PS configuration from Undewadi Kade pathar (Ch. Deshmukh Chowk and Dhawan Patil Chowk (Baramati) Phaltan section of NH-160 in the State of Maharashtra on EPC mode. RO/MUM/TENDER/2022-23/04

Shri Satyasai Baba Infra Ventures Private Limited Got A New Project
Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section Km 258.300 to Km 306.300 of NH-752 I to two LPS configuration on EPC Mode in the State of Maharashtra. RO/MUM/TENDER/2022-23/02

B R Goyal Infrastructure Limited Got a New Project
Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH-752G Design Ch Km 64.000 to Km 101.140 2LPS Four Lane configuration in the state of Maharashtra on EPC mode. RO/MUM/TENDER/2022-23/05

RAJSHEKHAR CONSTRUCTIONS PVT LTD Got a New Project
Design and Constn of Two Nos Maj Pmt Br of Span 75 Mtr Over Ishuri Nallah at Km 172.75 and 120 Mtr (60×2)over Devosara-ii River at Km 178.87 With Steel Superstructure (Through Type)on Well Fdn Incl Both Side Approach Rd for Two Br on Rd Ldp 71rcc/24 Nit-07/2022-23