The Ministry of Road Transport and Highways (MoRTH), through its P6 Delhi division and the Regional Office (RO) in Mumbai, has successfully concluded the tendering process for the 4-laning of the Ponda to Bhoma section of National Highway (NH)-748 in the state of Goa. This significant infrastructure project is being executed on an Engineering, Procurement, and Construction (EPC) Mode.
The specific stretch of NH-748 undergoing this upgrade spans from Kilometer 125.440 to Kilometer 135.050, covering a vital link within the state of Goa. The expansion to a 4-lane configuration aims to significantly enhance connectivity, improve traffic flow, and cater to the growing transportation needs of the region.
The financial bids for this important infrastructure development were officially opened on March 18th, 2025, by the designated authorities representing the Ministry of Road Transport and Highways, the P6 Delhi division, and the Regional Office in Mumbai. Following a thorough evaluation of the submitted proposals, Jeet Asia Pvt Ltd emerged as the bidder with the minimum quoted value, thereby securing the contract for this substantial undertaking.
The total estimated value for the 4-laning of the Ponda to Bhoma section of NH-748 amounts to Rs. 2,731,121,000. This substantial investment by the Ministry of Road Transport and Highways underscores its commitment to developing and modernizing the national highway network in Goa, contributing to better transportation infrastructure and fostering economic growth within the state.
Key Points:
- Project: 4-laning of Ponda to Bhoma section of NH-748.
- Highway: NH-748 (Km 125.440 to Km 135.050).
- Location: Goa.
- Tendering Authority: Ministry of Road Transport and Highways (MoRTH).
- Contractor Name: Jeet Asia Pvt Ltd.
- Project Value: Rs. 2,731,121,000.
- M/S Mahendra Singh Khedla Got A Project:WIDENING AND STRENGTHENING CHIRAWA
- Globe Civil Projects Limited Got A Project: Construction of residential building (3B plus G plus 11) including allied services at IITD Extension Campus at Sector-3
- Rajiv Mishra Contractor Got A Project:Construction of High Level Bridge over Chappi River in Km. 8th of SH-119 from NH 52 Km
- M/s Barkat Ali Bahadur Khan Got A Project:Widening and strengthening work on Pali
- M/s Foujdar Constt. Co Got A Project:FOUR LANE CONSTRUCTION WORK OF BHARATPUR ACHHANERA ROAD