PWD – Roads and Bridges, under the Ujjain CE Ujjain Zone, invited a tender for the Construction of the Tanodiya–Madkota Road. The project spans 21.10 km and includes comprehensive electrification work, aimed at improving travel safety and enhancing the overall road infrastructure. This development falls under the Agar-Malwa Division, an important region requiring strengthened road connectivity to support mobility and rural access.
The proposed construction will significantly enhance regional transportation, offering a smoother and more reliable route between Tanodiya and Madkota. The electrification component will ensure better illumination, reduced accident risk, and improved travel conditions during night hours. The project aligns with the state’s continued efforts to modernize road networks and promote balanced development in semi-rural areas.
The tender’s financial bid was opened on 14th October 2025 by PWD – Roads and Bridges, Ujjain CE Ujjain Zone. Several eligible firms participated in the bidding process, ensuring competitive evaluation. Heera Ram Godara emerged as the lowest (L1) bidder, securing the contract for executing both road construction and electrification works as per departmental standards.
The total project value stands at Rs. 286,908,958.8, marking a substantial investment for improving infrastructure within Agar-Malwa District. Once completed, the upgraded Tanodiya–Madkota Road will boost connectivity, enhance transport efficiency, and support economic and social development for local communities.
Key Points
- Authority: PWD – Roads & Bridges, Ujjain CE Ujjain Zone
- Project: Construction of Tanodiya–Madkota Road
- Length: 21.10 km with electrification
- Division: Agar-Malwa
- Financial bid opened on 14 Oct 2025
- Contractor Name: Heera Ram Godara
- Project value: Rs. 286,908,958.8
- M/s Sildiliya Construction Got A Project: Widening Strengthening Reconstruction of Ghanghri to Koleshwari Temple via Dantar Road from KM 0.00 to 10.935
- Ramprasad Rathore Contractor & Suppliers Got A Project: Upgradation of Kalpi Chhindgaon Pipariya Road Length 31.30 KM. Including Electrification Work.
- Ravi Shankar Jaiswal Got A Project: Upgradation of Balpur Dhanora Road Length 17.50 KM. Including Electrification Work
- M/s Dilip Singh Raghuvanshi Got A Project: Construction of Gotegaon Dhooma MDR Road Length 18.60 KM.
- Manish Agrawal Got A Project: CONSTRUCTION OF UJJAIN TIRAHA TO NAGUKHEDI ROAD LENGTH 3.70 KM WITH ELECTRIFICATION WORK DIVISION NEEMUCH





