The Ministry of Road Transport and Highways, through P5 Delhi / LWE – MoRTH, RO Raipur – MoRTH, and NH Chhattisgarh PWD-Raipur, has invited a tender for the Construction and Up-gradation of the Kutul to Nilangur stretch on NH-130D. This project covers Km 98.160 to Km 105.330, with a total upgraded length of 7.170 km under PKG-4 (Part-2). The development is part of an ongoing plan to enhance national highway connectivity within Chhattisgarh, especially toward the Maharashtra Border.
The scope of work includes converting the existing route into a two-lane highway with paved shoulders, improving surface quality, and strengthening the pavement structure. This upgrade aims to handle increasing traffic flow, support interstate transport, and provide safer mobility for local communities. Enhanced drainage, improved geometric curves, and standard safety installations are also included in the project.
The tender is designed to ensure long-term durability and alignment with MoRTH standards, focusing on better road performance and reduced maintenance needs. By improving this key link, the project is expected to support regional development, logistics efficiency, and rural-market access across the affected districts.
The financial bid opened on 12th September 2025, with GANESH PRASAD KHETAN quoting the minimum value for the work. The total project value has been recorded as Rs. 49,51,96,695, marking it as a significant investment in Chhattisgarh’s road infrastructure network.
Key Points
- Tender by MoRTH, P5 Delhi / LWE – MoRTH, RO Raipur.
- Project covers 7.170 km from Km 98.160 to 105.330.
- Two-lane upgrade with paved shoulders.
- Part of NH-130D PKG-4 (Part-2).
- Financial bid opened on 12 Sept 2025.
- Contractor Name: Ganesh Prasad Khetan
- Project value Rs. 49,51,96,695.
- Raisingh and Company Got A Project: Construction of Railway Over Bridge at Railway Crossing no. 269 at KM 937/28-30 Amla-Nagpur Section on Amravati road
- Nityanta Infra projects Private Limited Got A project: Construction of High Level Bridge Across Runj River in KM 2 on Guchhara to Kalyanpur Road
- H N Choudhary Construction Private Limited Got A Project: IRQP/Strengthening Work of Raghunathpur to Barmasia Road
- Dilip Kumar Got A Project: Re-construction work (including bridge construction) of Kumharia more
- Manoj Kumar Singh Got A Project: Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road


