Search your favourite project
Search
Generic filters

Contractor Name :

Four Laning of Dhrol-Bhadra Patiya Section NH-151A (between Ex. Km 5+700 to Km 13+600 of SH-25) and Bhadra patiya – Pipaliya section of NH-151A (Between Ex 73+000 to Km 44+800 and Ex. Km 38+350 to 24+000 of CSH-6) in Gujarat through Public Private Partnership (PPP) (The project) on design,build,operate and transfer (the DBOT Annuity or Hybrid Annuity) basis.

Bid Prioject Cost 882.00 Cr.
Mode : Hybrid Annuity
1st Year O&M (INR in Cr.) 3.00
Completion period and operation period 24 Month / Operation period 15 Years from COD
Leangth approxx 50.45 KM
Date of LOA on 14.12.2020

Contractor Name : Dilip Buildcon limited

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Devender phogat
Devender phogat
5 months ago

Earth work so plz contact