PWD – CE AND AS, in coordination with ACE Kota, SE Baran, and EE Baran, invited a tender for the Construction work of MDR-266, which includes the widening and strengthening of the Barana to Dadwara via Kunjed Road in Baran district. This project aims to upgrade an important inter-village corridor that plays a vital role in supporting regional mobility, agricultural movement, and daily transportation needs.
The scope of work includes widening the existing roadway, strengthening pavement layers, improving drainage structures, and enhancing safety components along MDR-266. The route connects multiple rural settlements and is essential for transporting agricultural produce, facilitating market access, and ensuring smooth movement for residents. By improving the structural capacity of the road, the project will help reduce travel delays and enhance overall connectivity within Baran district.
The financial bid for this project was opened on 12th September 2025 by officials from PWD – CE AND AS, ACE Kota, SE Baran, and EE Baran. The bid evaluation process adhered to departmental standards, ensuring a transparent and competitive environment among participating contractors. The project attracted strong interest due to its scale and importance to local infrastructure development.
Among all bidders, Balbir Singh Contractors quoted the minimum value for execution. The total project value stands at Rs. 305,708,090.7, marking a substantial investment aimed at strengthening rural road infrastructure and improving long-term transport efficiency along MDR-266.
Key Points
- Tender for widening & strengthening of MDR-266.
- Road stretch: Barana to Dadwara via Kunjed.
- Located in Baran district.
- Financial bid opened on 12 September 2025.
- Contractor Name: Balbir Singh Contractors.
- Project value: Rs. 305,708,090.7
- Sathlokhar Synergys E&C Global Got A Project: Construction of IT Office Commercial Mixed Use Building Including Civil Construction Electrical
- Naamakkal Constructions Got A Project: Fencing by Construction of See-Through barrier along the boundary of Pallikaranai Marsh
- Durga Engineers and Earth Movers Got A Project: C/o Remaining Drains, Culverts and Retaining Walls For 5 perent abadi Plots in sector- 145
- M/S Prism Constructions Got A Project: Construction of CM Model Composite Vidhyalaya in District Siddharth Nagar.
- Shreejikrupa Buildcon Ltd Got A Project: CONSTRUCTION OF PROPOSED TYPE-II RESIDENTIAL QUARTER AT INDIA RESERVE BATTALION-II DEHRADUN EAST HOPE TOWN

