6 C
London
Wednesday, January 26, 2022

Siddhant

0 COMMENTS
1 POSTS

featured

NHAI New Consturction of 4 Lane Elevated corridor in Lucknow-Sitapur

Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24...

Construction of new 2 Lane Major Bridge in the State of Bihar

Construction of new 2 Lane Major Bridge with its approaches from design Chainage 0.000 to 2.150 across River Sone in the State...

M/s PUNA HINDA Gets Construction of Balance Work of 2 Lane with Paved Shoulders in the State of Arunachal Pradesh

Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00...
- Advertisement -

Latest news

Morth award work order for strenghtening of Bailey Bridges in the State of Mizoram

Strengthening of km 10.00 to km 33.00 on NH-306A including strengthening by construction of Retaining walls and Culverts and Strengthening of 3...
- Advertisement -

Most Commented

NHAI New Consturction of 4 Lane Elevated corridor in Lucknow-Sitapur

Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24...
- Advertisement -

M/s JKM INFRA WORKS LLP Got Widening/Improvement to 4 (Four) Lane with Paved Shoulder in the state of Assam

Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7)...

Construction of new 2 Lane Major Bridge in the State of Bihar

Construction of new 2 Lane Major Bridge with its approaches from design Chainage 0.000 to 2.150 across River Sone in the State...

M/s PUNA HINDA Gets Construction of Balance Work of 2 Lane with Paved Shoulders in the State of Arunachal Pradesh

Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00...

Welcome To Subinfra

Get information of Exclusive Projects
Hurry Now!!!