The Mumbai Metropolitan Region Development Authority through its Engineering Department invited a tender for the Shahad Railway Over Bridge Project. The project involves the design and construction of the Shahad Railway Over Bridge (ROB) on the Central Railway network, aimed at improving traffic movement and eliminating delays caused by railway level crossings.
The scope of work includes detailed engineering design, construction of the railway over bridge, approach roads, structural components, drainage arrangements, utility shifting, traffic safety measures, and other allied civil works. The project is intended to provide uninterrupted road connectivity, reduce traffic congestion, and enhance commuter safety in the Shahad area.
As per the tender details, the financial bid was opened on 11 May 2026 by the Mumbai Metropolitan Region Development Authority (MMRDA). Following evaluation of the bids submitted by participating contractors, Aakshya Infra Projects Pvt. Ltd. emerged as the bidder quoting the minimum value for execution of the project.
The total project value stands at Rs. 2,200,840,580, reflecting a major investment in urban transport infrastructure. Upon completion, the Shahad Railway Over Bridge will improve connectivity, reduce travel time, eliminate traffic bottlenecks at the railway crossing, and strengthen the transportation network in the Mumbai Metropolitan Region.
Key Points:
- Authority: Mumbai Metropolitan Region Development Authority (MMRDA)
- Department: Engineering
- Project: Design and Construction of Shahad Railway Over Bridge (ROB)
- Location: Shahad, Central Railway, Maharashtra
- Contractor Name: Aakshya Infra Projects Pvt. Ltd.
- Project Value: Rs. 2,200,840,580
- Ganesh Enterprises and Constructions Private Limited Got A Project: Construction of ROB and C.C service road from Annabhau Sathe chowk to Khalsa high school
- Aakshya Infra Projects Pvt. Ltd. Got A Project: [Design and Construction work of Shahad ROB on Central Railway
- Technogem Consultants Pvt. Ltd Got A Project: Appointment of Project Management Consultancy Services for the balance length of Construction of Kalyan Ring Road Segment
- Shri Krishna and Company Got A Project: Construction of Submersible Bridge Including Approach Road Across Kunwari River on Itaura-Sujarma Road
- Atul Kurariya Private Limited Got A Project: Construction of MDR-12-02 Chitrangi to Chitawal, Tamai, Jharkata, Barwadih, (Ghorawal) UP border, road length 45.20 km.
