The Allahabad Municipal Corporation, through its Environment Department, has invited a tender for a significant urban infrastructure improvement initiative under the CM GRIDS Scheme. The project focuses on the Comprehensive Integrated Road Redevelopment of two important city roads — Tagore Town Road and Kalyani Devi Road. These stretches are vital public corridors that support large volumes of daily traffic and connect major residential and commercial areas within Allahabad.
The redevelopment plan includes full-scale renovation, structural strengthening, drainage enhancement, footpath development, and improved road geometry to ensure long-term durability. The project also incorporates modern urban design elements aimed at increasing safety, improving mobility, and elevating the overall commuting experience for residents and visitors. A notable feature of this tender is the inclusion of a 5-year maintenance period, ensuring sustained quality and timely upkeep after completion.
The financial bid for the project was opened on 23 October 2025 by the Allahabad Municipal Corporation’s Environment Department. The tender attracted competitive participation due to the project’s strategic importance and the long-term maintenance commitment built into the scheme. Opening the financial bid marks a crucial step toward finalizing the executing agency.
Among the bidders, M/s Anmol Associates quoted the minimum value and emerged as the lowest bidder. The total estimated project cost stands at Rs. 28,95,56,912.2, representing a major investment in improving Allahabad’s road infrastructure.
Key Points
- Tender issued by Allahabad Municipal Corporation – Environment Department
- Comprehensive Integrated Road Redevelopment under CM GRIDS Scheme
- Roads covered: Tagore Town Road and Kalyani Devi Road
- Includes 5-year post-completion maintenance
- Financial bid opened on 23 October 2025
- Contractor Name: M/s Anmol Associates
- project value Rs. 28,95,56,912.2
- M/s Anmol Associates Got A Project: Comprehensive Integrated Road Redevelopment of 2 Roads
- M/s Raj Construction Got A Project: Strengthening Work of Service Lane and Underpass of Amar Shaheedpath under CRIF in District Lucknow
- MUKESH VERMA Got A Project: Devlopment commercial 5 shops in old Etawah Road at satti talab
- GDS INFRASTRUCTURE Got A Project: Strengthening works by BM and BC in SH-60 PD
- Pavai Infra Geotech. Got A Project:TREATMENT OF 01 NOS LAND SLIDE ZONE KM 475.360 TOKM 475.625




