The Ministry of Road Transport and Highways (MoRTH), through its P6 Delhi division, the Regional Office (RO) in Mumbai, and the NH Division-Aurangabad, has successfully concluded the tendering process for the maintenance of a significant section of National Highway (NH)-753M in Maharashtra. The project encompasses the Bhokardan – Hasnabad – Jawkheda – Rajur – Deulgaonraja section, stretching from Km. 0.000 (Kumbhari Phata) to Km. 63.900 (Dulgaonraja), along with an extension from Km. 17.900 (Jawkheda Phata) to Km. 20.730 (Talegaon Phata).
This maintenance work covers a total length of 62.153 kilometers of a road with a 2-Lane with Paved Shoulders (2L PS) to 4-Lane configuration. Ensuring the upkeep of this vital stretch is crucial for maintaining smooth traffic flow, road safety, and the longevity of the infrastructure within the Aurangabad region.
The financial bids for this important maintenance project were officially opened on March 25th, 2025, by the designated authorities representing the Ministry of Road Transport and Highways, the P6 Delhi division, the Regional Office in Mumbai, and the NH Division in Aurangabad. Following a thorough evaluation of the submitted proposals, Courage Infra Pvt Ltd emerged as the bidder with the minimum quoted value, thereby securing the contract for these essential maintenance services.
The total estimated value for the maintenance of this extensive section of NH-753M amounts to Rs. 196,104,487.6. This investment by the Ministry of Road Transport and Highways underscores its commitment to the proper upkeep and functionality of the national highway network, ensuring safe and efficient transportation for the benefit of commuters and the overall economy of Maharashtra.
Key Points:
- Project: Maintenance of Bhokardan – Deulgaonraja section of NH-753M.
- Highway: NH-753M (Km. 0.000 to 63.900 and Km. 17.900 to 20.730).
- Location: Aurangabad, Maharashtra.
- Tendering Authority: Ministry of Road Transport and Highways (MoRTH).
- Contractor Name: Courage Infra Pvt Ltd.
- Project Value: Rs. 196,104,487.6.
- Brilliant Infraprojects Private Limited Got A Project: Construction of 4lane standard road from Nelson Mandela square to Khandual
- DPS Contractors Private Limited Got A Project: Imprvt. such as widening and strengthening
- M J Infra Got A Project: Municipal Corporation of Greater Mumbai||Roads and Traffic Department||Deputy Chief Engineer
- AIC Infrastructures Got A Project: Maintenance and attending Potholes and bad patches of Eastern Express Highway and Eastern Freeway
- Gangamai Industries and Constructions Limited Got A Project: Providing concrete pavement to main internal roads in B, C, K M Block

